Staples Parking Garage
Location:
Framingham, MA
Year:
2011
Owner:
Staples, Inc., Framingham, MA
Architect:
Gensler, Boston, MA
Engineer:
McNamara • Salvia, Boston, MA
Contractor:
Creenshaw Construction, lower Falls, MA
Erector:
Blakeslee Prestress, Inc., Branford, CT
Project Scope
Sq. Footage:
193,792 sf of supported structured area (approx.)
Levels/Floors:
3 Levels, 827 spaces (approx.)
Structural Precast Elements:
484 Total
• 252 Double Tees
• 15 Girders
• 26 Columns
• 18 Shear Walls
• 40 Lite Walls
• 61 Spandrels
• 9 Stairs
• 23 Solid Slabs
• 40 Wall Panels
• 252 Double Tees
• 15 Girders
• 26 Columns
• 18 Shear Walls
• 40 Lite Walls
• 61 Spandrels
• 9 Stairs
• 23 Solid Slabs
• 40 Wall Panels
The Staples Parking Garage in Framingham, Massachusetts, was open for occupant in December of the 2011 just in time for holiday shoppers. Gensler in Boston designed the three-level, 827-space garage and Crenshaw Construction out of Newton Lower Falls, Massachusetts, served as the general contractor.
Blakeslee Prestress provided unequalled control over all aspects of the design, manufacturing & erection process. Blakeslee Prestress began the precast erection in September 2011 and completed in November of the same year.
Timeline:
Contract Awarded — April 14, 2011
Start Precast Erection — September 26, 2011
Precast Erection Completed — November 11, 2011
Completion & occupancy — December 9, 2011 (approx.)